Cleared the ground in the summer of 2022. Everything since, footings, timber frame, the stone terrace, has gone up a few weeks here and there until now. This is the record of it.
The build. Best viewed on large screens.
393 Photos
Grouped from oldest to newest. Hover or click on a picture to open it full size, or tap the picture on a phone. Use arrow keys on a computer or swipe left/ right on a phone, to move through the images. Swipe down in phone or click the X to close the full size image on large screen.
01
Land and Site Prep
17 photos · Jul 2022 to Aug 2022
02
Foundation
31 photos · Aug 2022
03
Framing
34 photos · Aug 2022 to Sep 2022
04
Tin Roof Installation
12 photos · Sep 2022 to Oct 2022
05
Windows and Doors
4 photos · Oct 2022 to Jul 2023
06
Systems (Electrical and Plumbing)
7 photos · Jul 2023
08
Exterior Finish
97 photos · Sep 2022 to Sep 2026
09
Interior Finish
1 photo · Jul 2023
10
Gazebo
120 photos · Sep 2022 to Sep 2026
11
Sunsets and Scenery
53 photos · Jul 2020 to Sep 2026
12
4th of July
4 photos · Jul 2025
13
Collage
every section but Misc, in one image
14
Misc
13 photos · Sep 2022 to Oct 2024
15
Videos
6 clips
15 · VideosThe rebar mat in the forms, the mixer by the slab.Aug 202215 · VideosAlong the forms, rebar and bagged concrete ready to pour.Aug 202215 · VideosOn the roof, laying the red metal panels.Oct 202215 · VideosRed panels going up the gable side, canopy beside the house.Oct 202215 · VideosThe house from up the hill, the red roof nearly done.Oct 202215 · VideosWorking the last roof panels, seen from the slope.Oct 2022